Past Work
Case Studies
NWR
Module Assembly of Pipe and Structural, E&I and Insulation of 53 Modules.
SCOPE:
Fifty-three (53) Modules, Structural Assembly, Pipe Assembly, E&I, Insulation. Included modifications to supplied Equipment (vessels), tie-in welding, structural and pipe fabrication as required.
STATS:
Project Statistics Coming Soon.